Solset AISolset AI
Marketplace
Pricing
Log inStart free
Solset AISolset AI
Marketplace
Pricing
Log inStart free
India Rooftop Solar Utility Directory (2026)

DISCOM Solar Net-Metering Rules & Regulations

Find out how much solar capacity your electricity board permits, technical feasibility limits, and required paperwork before applying.

Instant Feasibility Checker

Check Your Permissible Solar Capacity

Select your DISCOM and sanctioned load to check maximum allowable solar plant size.

Load:kW
Max Solar Allowed
3 kWp
100% of sanctioned load
Metering Type
Net Metering
Bi-directional Smart Meter
Grid Connection
LT Connection
Low Tension up to 150 kW
Avg. Approval Time
~21 Days
From portal application

All Electricity Boards (14)

Select any utility to review state-specific net-metering policies.

Maharashtra
PM Surya Ghar Integrated

Maharashtra State Electricity Distribution Co. Ltd.

MSEDCL (Mahavitaran)
Max Permitted Load
100% of Load
Turnaround Time
~21 Days
Key Regulations:
  • •Up to 100% of sanctioned load permitted for net metering.
  • •Annual energy settlement cycle ends in March with banking credits.
  • •Fully integrated with the PM Surya Ghar National Portal for DBT subsidies.
Documents Needed:
Latest MSEDCL electricity bill with paid receiptProperty ownership deed / Index-II / Tax receiptAadhaar card of consumer & passport size photographDCR module certificate & inverter manufacturer test report
Official Portal
Maharashtra
PM Surya Ghar Integrated

Tata Power Company Ltd. (Mumbai Distribution)

Tata Power Mumbai
Max Permitted Load
100% of Load
Turnaround Time
~15 Days
Key Regulations:
  • •Fast digital processing within 15 working days.
  • •Net metering available for all residential and institutional categories.
Documents Needed:
Electricity billIdentity proofSite single-line diagram (SLD)
Official Portal
Maharashtra
PM Surya Ghar Integrated

Adani Electricity Mumbai Ltd.

Adani Electricity Mumbai
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
  • •Rapid digital net-meter installation.
  • •Zero application fees for residential rooftop systems under PM Surya Ghar.
Documents Needed:
Latest billNOC from building society (for apartments)Inverter test cert
Official Portal
Gujarat
PM Surya Ghar Integrated

Dakshin Gujarat Vij Company Ltd.

DGVCL
Max Permitted Load
80% of Load
Turnaround Time
~18 Days
Key Regulations:
  • •Gujarat Solar Power Policy: Up to 80% of sanctioned load for LT consumers.
  • •Surplus injection credited at ₹2.25/unit for residential systems.
  • •Seamless digital workflow through GUVNL portal.
Documents Needed:
Electricity billMunicipal tax bill / 7-12 utaraAadhaar card
Official Portal
Gujarat
PM Surya Ghar Integrated

Torrent Power Ltd. (Ahmedabad, Gandhinagar, Surat)

Torrent Power
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
  • •Allows up to 100% of sanctioned load for residential consumers.
  • •Fast-track bi-directional smart meter installation.
Documents Needed:
Electricity billAadhaarWork completion report
Official Portal
Delhi
PM Surya Ghar Integrated

BSES Rajdhani Power Ltd.

BSES Rajdhani (BRPL)
Max Permitted Load
100% of Load
Turnaround Time
~15 Days
Key Regulations:
  • •Delhi Solar Policy: Generation-Based Incentive (GBI) of ₹3.00/unit for residential.
  • •No height restriction on solar structures up to 2 meters for rooftop clearance.
  • •Up to 100% of sanctioned load permitted.
Documents Needed:
CA number billOwnership documentAadhaar cardSite SLD
Official Portal
Delhi
PM Surya Ghar Integrated

Tata Power Delhi Distribution Ltd.

Tata Power DDL (TPDDL)
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
  • •Fully digital end-to-end net metering within 14 days.
  • •Delhi GBI subsidy benefits credited directly on monthly bill.
Documents Needed:
Electricity billIdentity proofInverter serials
Official Portal
Karnataka
PM Surya Ghar Integrated

Bangalore Electricity Supply Company Ltd.

BESCOM
Max Permitted Load
100% of Load
Turnaround Time
~25 Days
Key Regulations:
  • •KERC Solar Regulations: Net metering up to 100% of sanctioned load.
  • •Residential LT limit typically up to 50 kW.
  • •Energy settlement banking on monthly basis.
Documents Needed:
Account ID billKhata certificate / title deedInverter test cert
Official Portal
Rajasthan
PM Surya Ghar Integrated

Jaipur Vidyut Vitran Nigam Ltd.

JVVNL (Jaipur Discom)
Max Permitted Load
80% of Load
Turnaround Time
~21 Days
Key Regulations:
  • •Rajasthan Rooftop Solar Regulations: 80% cap on sanctioned load.
  • •Highest solar irradiance in India (~5.5 kWh/m²/day).
Documents Needed:
K-number electricity billAadhaarRegistry / Jamabandi
Official Portal
Tamil Nadu
PM Surya Ghar Integrated

Tamil Nadu Generation and Distribution Corporation Ltd.

TANGEDCO
Max Permitted Load
100% of Load
Turnaround Time
~30 Days
Key Regulations:
  • •TNERC Solar Net Feed-in & Net Metering Framework.
  • •Network service charges apply on gross generation for non-domestic.
  • •100% PM Surya Ghar subsidy disbursement on National Portal.
Documents Needed:
Consumer number billProperty tax receiptSingle Line Diagram
Official Portal
Uttar Pradesh
PM Surya Ghar Integrated

Paschimanchal Vidyut Vitran Nigam Ltd. (Noida, Meerut)

PVVNL
Max Permitted Load
75% of Load
Turnaround Time
~25 Days
Key Regulations:
  • •UPERC Solar Policy: Up to 75% of sanctioned load for residential net metering.
  • •State subsidy top-up of ₹15,000 to ₹30,000 under UP Solar Energy Policy.
Documents Needed:
UPPCL Account number billAadhaarSite photograph
Official Portal
Haryana
PM Surya Ghar Integrated

Dakshin Haryana Bijli Vitran Nigam

DHBVN (Gurugram, Faridabad)
Max Permitted Load
100% of Load
Turnaround Time
~20 Days
Key Regulations:
  • •HERC Net Metering: Mandatory for residential plots 500 sq. yards and above.
  • •Up to 100% of connected load allowed.
Documents Needed:
Electricity billPlot registry documentCEA safety certificate
Official Portal
Telangana
PM Surya Ghar Integrated

Southern Power Distribution Company of Telangana Ltd.

TSSPDCL (Hyderabad)
Max Permitted Load
100% of Load
Turnaround Time
~21 Days
Key Regulations:
  • •Allows up to 100% of contracted load.
  • •Dedicated single-window clearance for net meter inspection.
Documents Needed:
USC number billProperty ownership proofInverter datasheet
Official Portal
Punjab
PM Surya Ghar Integrated

Punjab State Power Corporation Ltd.

PSPCL
Max Permitted Load
80% of Load
Turnaround Time
~25 Days
Key Regulations:
  • •PSERC Rooftop Regulations: Net metering up to 80% sanctioned load.
  • •Settlement of surplus injection on annual billing cycle.
Documents Needed:
Electricity account billAadhaarContractor installation certificate
Official Portal

Need Help With DISCOM Approvals & Net-Metering?

Avoid long bureaucratic delays. Connect with Solset verified local EPC contractors who handle end-to-end liaisoning, bi-directional meter sanction, and PM Surya Ghar portal uploads.

Free consultation · Fast approvals · Zero spam

More free tools

While you are here. Everything below is free.

Know Your Quote

Upload a solar quotation and get it scored out of 100 — price, scope, warranty, red flags.

Compare quotes

Two or more quotations, ranked side by side on what actually differs.

Build your own quote

Price a system yourself: bill of materials, subsidy and payback.

AI bill scanner

Photograph an electricity bill; get the load and a suggested system size.

Solar loan calculator

EMI against savings, month by month, so the cashflow is honest.

Commercial ROI

Payback and tax benefits for a factory, warehouse or office roof.

India

Subsidy calculator

PM Surya Ghar as the scheme pays it: fixed slabs per kW, capped.

Marketplace

Find vendors and installers — or list your own business.

Solset AISolset AI

Every solar job on one record — design, quotation, procurement, installation, invoicing and service, for solar companies anywhere.

Made in India for the world

Sell

  • CRM & pipeline
  • Design Studio
  • Quotations
  • Product demos

Build & service

  • Projects & crews
  • Procurement & inventory
  • Service & AMC
  • AI Intelligence

Get paid

  • Finance
  • Pricing
  • All features
  • How it works

Who it is for

  • Residential
  • Commercial
  • Industrial
  • Marketplace
  • Roadmap
  • Zoho integration

Company

  • About us
  • Careers
  • Contact us
  • Enterprise enquiry
  • Request demo
  • Blog

Legal

  • Sign in
  • Privacy policy
  • Refund policy
  • Terms of service

Free solar tools & calculators

Know Your QuoteCompare quotesBuild your own quoteAI bill scannerSolar loan calculatorCommercial ROISubsidy calculatorIndiaDISCOM directoryIndiaMarketplaceBuild Your Quote

Compare & guides

Solar CRM IndiaSolar EPC SoftwareProject ManagementSolset vs ZohoSolset vs HubSpotSolset vs Spreadsheets

Solar CRM by state

GujaratMaharashtraRajasthanTamil NaduKarnatakaUttar PradeshPunjabHaryanaCaliforniaTexasFloridaNew YorkArizonaNevadaColorado

Solar CRM by city

BengaluruMumbaiPuneHyderabadChennaiDelhiGurugramNoidaAhmedabadSuratJaipurLucknowCoimbatoreChandigarhKolkataNagpurIndorePatnaKochiVisakhapatnamLos AngelesSan DiegoSan FranciscoPhoenixHoustonDallasAustinMiamiOrlandoNew York CityDenverLas Vegas

© 2026 Solset Technologies Pvt Ltd · All rights reserved

CRM for Solar · Solar EPC Software · Solar Lead Management

Every solar job, on one recordFree plan · no card

Start free